Chrysalis Rail LLP had a requirement to install a 30m rail maintenance pit to enhance their facility at Long Marston.
Sector
client
Chrysalis Rail LLP
Show dates
Nov 23 - Dec 24
Location
Long Marston
The Scope of Work
- Break out concrete and remove the existing rail track
- Excavate and dispose arisings off site
- Design and build the reinforced concrete rail pit
- Install the rails to a +/- 2mm tolerance
- Construct jacking slabs to either side of the rail pit
recent projects
A deep mine infrastructure development to facilitate extraction and processing of Polyhalite ore.
A significant Road and Carpark upgrade package of works for Porterbrooks Rail Innvovation Centre in Stratford Upon Avon.
Our expertise ranges from initial feasibility, consultancy and design services, through to construction, commissioning, operation and maintenance.