Chrysalis Rail LLP had a requirement to install a 30m rail maintenance pit to enhance their facility at Long Marston.

client

Chrysalis Rail LLP

Show dates

Nov 23 - Dec 24

Location

Long Marston

The Scope of Work

  • Break out concrete and remove the existing rail track
  • Excavate and dispose arisings off site
  • Design and build the reinforced concrete rail pit
  • Install the rails to a +/- 2mm tolerance
  • Construct jacking slabs to either side of the rail pit